Minggu, 31 Januari 2016

VMware News Releases

VMware Introduces the VMware VirtualCenter Suite for Blade Servers

Virtual Infrastructure Software Suite Multiplies the Benefits of Blades By Optimizing Density, Utilization and Availability

PALO ALTO, Calif., November 10, 2003- VMware, Inc., the global leader in virtual infrastructure software for industry-standard systems, today announced the VMware VirtualCenter Suite for Blade Servers, an integrated software suite that brings virtualization to blade servers.
The low-cost, high-density nature of blade servers makes them an ideal platform for deploying a virtual infrastructure. By layering the suite on top of blade servers, administrators can transform a blade chassis into a highly utilized and scalable virtual computing appliance 


with mainframe-class resource management.
The VirtualCenter Suite for Blade Servers consists of VMware VirtualCenter, VMware ESX Server with Virtual SMP and the company's groundbreaking VMotion technology that enables the movement of live, stateful virtual machines from one blade to another while maintaining continuous service availability. Enterprises that deploy the VirtualCenter Suite for Blade Servers will realize an unprecedented optimization of their blade server infrastructure.
The VirtualCenter Suite for Blade Servers is ideal for server consolidation, disaster recovery and data center operations that require high density and demanding operational efficiencies. Customers can expect to achieve:
  • Mainframe-class Resource Flexibility and Utilization:
    • Increased server densities up to 225 servers per blade chassis
    • Greater blade server utilization rates up to 80%
    • Flexible and dynamic resource management both within an individual blade and across the chassis using VMotion
  • Rapid Resource Provisioning:
    • Instant provisioning of blades
    • Decreased application deployment and lifecycle time
  • Unprecedented Hardware Availability:
    • Elimination of scheduled downtime for blade hardware upgrades and maintenance
    • Zero downtime migration of virtual machines between blade servers and standard rack-mounted servers
    • Optimization of mixed blade server infrastructure in and across chassis, based on changing demands and service level agreements (SLAs)
"Enterprises want to maintain the benefits of virtualization as they adopt blade servers," said Michael Mullany, vice president of marketing at VMware. "VMware has worked with our key partners to bring virtual infrastructure to industry leading blade servers. Together, they provide unparalleled server density and rapid resource provisioning and provide the perfect foundation for the next generation datacenter."
"VMware ESX Server is a major building block in Fujitsu-Siemens Computers' server consolidation strategy," said Joseph Reger, chief technology officer, Fujitsu Siemens Computers. "With the introduction of the VirtualCenter Suite and the groundbreaking VMotion technology, VMware becomes an integral component of our business critical computing solutions. VMware's virtual infrastructure software running on PRIMERGY Servers and in the future on X Blades, fulfills the highest requests for availability, reliability and flexibility."
"Customers are increasingly looking to virtualization solutions for agility and cost benefits. HP ProLiant BL p-Class blade servers are an ideal platform for virtualization, in addition to providing security and scalability," said Nick van der Zweep, director of utility computing, Enterprise Systems Group at HP. "The inherent benefits of blades are augmented when coupled with VMware ESX Server running VirtualCenter and VMotion. Managing a rack or chassis of blades as a single pool of resources yields increased utilization rates and enhanced performance and availability. With our offering of industry-leading ProLiant blade servers together with VMware, customers are able to choose the most cost-effective solution fotheir computing needs."
"VMware and IBM have had a long relationship providing virtualization solutions for high-performance xSeries SMP platforms, and the new VirtualCenter Suite for Blade Servers now supports IBM's scaleout computing strategy with BladeCenter," said Jeff Benck, vice president of eServer BladeCenter at IBM. "VMware's VMotion technology coupled with BladeCenter's integrated solution environment enables customers to create an On-Demand infrastructure where they can dynamically allocate server capacity and optimize resources to reduce Total Cost of Ownership."
"The VMware Virtual Suite for Blades will further strengthen the value proposition of NEC BladeServers and Intelligent Management Software, 'SystemGlobe BladeSystemCenter'. Customers will benefit from the compact body and expandability of blades, while experiencing even easier maintenance, greater density, higher availability, and an increased ROI. We are impressed with the instant provisioning, zero-downtime maintenance and dynamic workload management capabilities of VMware VirtualCenter with VMotion and look forward to offering the VMware Virtual Suite for Blades to our customers," said Yoshikazu Maruyama, vice president, NEC Corporation.
Pricing and Availability
The VirtualCenter Suite for Blade Servers includes the VirtualCenter Management Server, VirtualCenter Management Packs, ESX Server with Virtual SMP and VMotion. Pricing for the Suite starts at $10,000. The Suite is available for HP and IBM blade servers through VMware. The Suite will be available for Fujitsu Siemens Computers and NEC through VMware in 2004. Contact VMware Sales by Email or 1-877-4VMWARE.
About VMware, Inc.
VMware, Inc. is the global leader in virtual infrastructure software for industry-standard systems. The world's largest companies use VMware solutions to simplify their IT, fully leverage their existing computing investments and respond faster to changing business demands. VMware is based in Palo Alto, California. For more information, visit www.vmware.com or call 650-475-5000.

VMware Workstation Pro

VMware Workstation Pro

What's New

VMware Workstation 12 Pro delivers leading-edge virtualization features

FAQs

Get answers to frequently asked questions for Workstation Pro.

Leading Edge PC Virtualization

VMware Workstation Pro transforms the way technical professionals develop, test, demonstrate and deploy software by running multiple x86-based operating systems simultaneously on the same PC. Built on 15 years of virtualization excellence and winner of more than 50 industry awards, VMware Workstation Pro takes desktop virtualization to the next level by giving users an unmatched operating system support, rich user experience and incredible performance.
Desktop Virtualization for Windows and Linux with VMware Workstation Pro

State of the Art Desktop Virtualization for Windows and Linux

VMware Workstation Pro takes advantage of the latest hardware to replicate server, desktop and tablet environments in a virtual machine. Run applications on a breadth of operating systems including Linux, Windows and more at the same time on the same PC without rebooting. VMware Workstation Pro makes it really easy to evaluate new operating systems like Windows 10, test software applications and patches, and reference architectures in an isolated and safe environment. No other desktop virtualization software offers the performance, reliability and cutting edge features of Workstation Pro.

Create Powerful Virtual Machines

With the ability to allocate multiple processor cores, gigabytes of main memory, and graphics memory to each virtual machine, Workstation Pro maximizes your computer’s resources to run the most demanding applications in a virtual environment. Workstation Pro even lets you run virtual ESXi hosts and vSphere appliances, letting you create an entire Software Defined Data Center right on your desktop.
Create powerful virtual machines with VMware Workstation Pro
vCloud Air to Move Your VMs from PC to Cloud

From the PC to the Cloud

Seamlessly access all the virtual machines you need, regardless of where they reside, from the PC to the cloud. Simply drag and drop to move your virtual machines from your PC to the private cloud with VMware vSphere or the public cloud with vCloud Air. By leveraging the hybrid cloud you are no longer constrained by the power of your PC and can quickly migrate and scale your workloads to the cloud while reducing complexity and maintaining compatibility.

Take Control of Your Virtual Machines

Workstation Pro gives technical professionals powerful controls over how to set up and interact with virtual machines. Choose from a wide variety of options for installing, protecting, connecting, sharing and viewing virtual machines to save valuable time. You can even create virtual machines that are encrypted, require a change of password and expire at a predefined date and time. Use the virtual network editor to build up to 20 custom virtual networks for connected multi-tier applications. Leverage the Snapshot feature to preserve the state of a virtual machine so you can return to it at any time.
Powerful controls of Virtual Machines with VMware Workstation Pro
Share virtual machines with VMware Workstation Pro

Share Your Virtual Machines

Sharing a virtual machine is the quickest way to share and test applications with your team in a more production like environment. Run VMware Workstation Pro as a server to share a repository of pre-loaded virtual machines in every desired configuration with your teammates, department or organization. VMware Workstation Pro provides enterprise caliber control over user access when sharing virtual machines.

VMware Workstation Pro is Designed For

Software Developers
Software developers rely on Workstation Pro integration with Visual Studio, Eclipse and other tool suites to streamline the development and debugging of their applications in multiple operating systems and environments. Developers can replicate a production web or hybrid cloud environment right on their PC.

Quality Assurance
Quality assurance teams use Workstation Pro to efficiently and economically test applications on a complex matrix of operating systems, application platforms and browsers—all while doing away with repetitive configuration tasks.

IT Professionals
VMware Workstation Pro allows IT professionals to safely test patch deployments, system upgrades and migrations in isolated sandbox environments on a single PC. Quickly recreate, capture and troubleshoot customer issues in a virtual environment. Experiment by running multiple operating systems and applications, or run enterprise-focused hypervisors like ESXi as virtual machines to build a personal lab while preparing forVMware Certification tests (i.e. VCP).

Technical Sales Professionals
Systems engineers and other technical sales professionals love Workstation Pro because it gives them the power to demonstrate complex multi-tier applications with ease. Workstation Pro can simulate an entire virtual network environment—including clients, servers and database virtual machines—all on a single PC.

Teachers and Trainers
Trainers use VMware Workstation Pro to create virtual machines for students that contain all the lessons, applications and tools required for the course. At the end of each class, VMware Workstation Pro can automatically revert the virtual machines back to their original state.

Jumat, 12 Juni 2015

Cara Menghapus dan Mengganti Akun Gmail di Android

Cara Menghapus dan Mengganti Akun Gmail di Android



Terinjak.com – Akun email pada sebuah perangkat Android merupakan hal yang sangat penting untuk para pengguna smartphone ini. Akun gmail mempunyai peranan penting untuk mengakses semua produk google service di android seperti Gmail, Youtube, dan yang paling penting Google Play Store untuk mengunduh aplikasi dan games.

Mengganti akun gmail di android seringkali dilakukan karena alasan tertentu seperti ; membeli hp android second/bekas yang didalamnya masih terkait dengan akun gmail si penjual atau anda ingin menjual hp android anda ke orang lain.


Bagi yang pemula yang baru memakai smartphone android pastinya akan bingung untuk mengganti akun email, namun jangan khawatir karena penulis akan memberikan cara menghapus atau mengganti akun gmail di hp android anda.

Cara Pertama Mengganti Gmail


Pertama, silahkan buka menu Setting .
Lalu scroll kebawah pada menu Accounts klik Google » Pilih akun emailnya lalu klik Remove Account.
Setelah itu anda buka aplikasi Gmail dan login dengan akun email yang baru.

Cara Kedua Mengganti Email
Silahkan menuju menu Setting » Aplication Manager
Kemudian cari Google Apps dan pilih Clear Data.
akan muncul pilihan “All information you’ve saved in this application will be deleted permanently”, Klik OK
Buka aplikasi Gmail dan nanti tambahkan email yang baru.

Cara Ketiga Mengganti Email (Khusus Root)

Dengan cara ini anda tidak perlu melakukan Factory Reset untuk mengganti email, cukup lakukan berikut ini khusus untuk HH yang sudah di Root.
Silahkan buka Aplikasi Root Explorer (jika belum punya silahkan cari di Playstore)
Lalu anda masuk ke data/system pada handphone
Cari “accounts.db” lalu hapus file tersebut
Setelah dihapus, silahkan lakukan restart untuk melihat hasilnya.

Semua cara diatas sudah berhasil untuk menghapus maupun mengganti akun gmail di hp android, jadi silahkan anda coba sendiri pada smartphone android anda.
Tag :

Sabtu, 19 Juli 2014

DELL Tutorial: Create RAID Using PERC 6/i Integrated BIOS Configuration Utility

DELL Tutorial: Create RAID Using PERC 6/i Integrated BIOS Configuration Utility

by Ramesh Natarajan on May 4, 2009
DELL Server LSI Logic Create Hardware RAID
Disk space is never enough. On an on-going basis system administrators will be getting request to increase the disk space on a server.

In this article, let us review how to add new physical disks and create a virtual disk with a RAID configuration on an DELL PowerEdge Server using PERC 6/i Integrated BIOS Configuration Utility.

The new DELL Servers has the ability to create RAID 0, 1, 5, 6 and 10 using the hardware controller.


Assume the scenario where the server came with 2 physical hard drives configured in RAID-1. This Logical Volume is where the operating system is installed and you got a request to expand disk space on this server. So, you have purchased additional disks and would like to configure a RAID setup. In this example, 4 additional disks are configured as RAID-5 on a DELL PowerEdge 2950 server. The same steps works on other DELL PowerEdge servers as long as you have the same PERC BIOS Configuration Utility.

If you are using an old server that uses PERC/CERC BIOS Configuration Utility, please refer to the article we wrote earlier about how to create RAID on DELL Servers using PERC/CERC BIOS Configuration Utility (with screenshots).

1. Launch PERC 6/i Integrated BIOS Configuration Utility

First, insert all new disks in the empty slots. If there are already disks on slot 0 and slot 1, start inserting the new disks from slot 2. In this example, the new 4 disks are inserted from slot-2 to slot-5.

After the disks are inserted, reboot the server. When the server is starting up, press Ctrl-R to launch the PowerEdge Expandable RAID Controller BIOS. Press Ctrl-R when it is displaying the following message on the console.

Ctrl-R Launch RAID Controller on Dell PowerEdge T105 Server
Fig: Press Ctrl-R to Launch DELL PowerEdge 2950 III Expandable RAID Controller

This will launch the PERC 6/i Integrated BIOS Configuration Utility. This utility will have the following three TABs on the top.
  • VD Mgmt – Virtual Disk Management, which will be selected by default.
  • PD Mgmt – Physical Disk Management
  • Ctrl Mgmt – Controller Management

2. Create New Virtual Disk

From the Virtual Disk Management, use arrow key and select ‘Controller 0′. Press F2 to show available operations for the ‘Controller 0′.  This will display a pop-up menu with following choices.  Select ‘Create New VD’.
  • Create New VD
  • Clear Config
  • Foreign Config
  • Manage Preserved Cache

Create New VD Menu for DELL PowerEdge 840 Server
Fig: Create New Virtual Disk on DELL PowerEdge 1950 III Server

This will display the Virtual Disk Management screen with ‘Create New VD’ Panel. Following are the various sections displayed in this screen:
  • RAID Level
  • PD Per Scan
  • Physical Disks Section
  • Basic Settings
    • VD Size
    • VD Name
  • Advanced Settings
    • Stripe Element Size
    • Read Policy
    • Write Policy
    • Force WB with no battery
    • Initialize
    • Configure HotSpare

3. Choose RAID Level for the Virtual Disk

Press Enter on the RAID option, which will display the following RAID choices. In this example, I choose RAID-5 as shown in the Fig below.
  • RAID-0
  • RAID-1
  • RAID-5
  • RAID-6
  • RAID-10

Select RAID Level for Dell PowerEdge T100 Server
Fig: Select RAID Level in Create VD Screen for DELL PowerEdge 2970 Server

4. Select the Physical Disks for the Virtual Disk Group (RAID Group)

After selecting the RAID Level, press TAB and jump to Physical Disks section. This section will display all available disks that are not configured yet.  Every physical disks will display Drive ID and Size.

Press space bar to select the disks. i.e the check-box in front of the physical disk will be selected. Once you’ve selected one disk, it will automatically jump to the next available disk.  Keep pressing space bar until all available physical disks are selected as shown below.

Select All Physical Disks For Dell PowerEdge T300 Server
Fig: Select All available Physical Disk in Create VD Screen for DELL PowerEdge R900 Server

5. Set Virtual Disk Group Basic Settings

Since I have selected 4 disks (each 139G) for RAID-5, the total usable space would be around 3x139G, which is approximately 418176MB. This total size is calculated and displayed automatically in the VD Size under basic settings. You can also assign a name to the VD. I’ve left VD Name field blank.

Create VD Basic Settings for Dell PowerEdge T610 Tower Server
Fig: Enter Basic Settings in Create VD Screen for DELL PowerEdge R805 Server

6. Set Virtual Disk Group Advanced Settings

I recommend leaving all the advanced settings to the default values.
  • Stripe Element Size – Default value is 64KB
  • Read Policy – Default value is No Read Ahead
  • Write Policy – Default Value is “Write Back”
  • By default, following values are not checked. i.e check-box not selected
    • Force WB with no battery
    • Initialize
    • Configure HotSpare

Create New VD Advanced Settings For Dell PowerEdge 2900 III Tower Server
Fig: Enter Advanced Settings in Create VD Screen for DELL PowerEdge R905 Server

7. New Virtual Disk (Logical Disk Group) Created with selected RAID Level

Press TAB to jump to OK and press enter.  You’ll get the following warning message. Click OK to continue. This will successfully create the new Virtual Disk with RAID-5 configuration.

Warning Message: It is recommended that all newly created logical drives be initialized unless you are attempting to recreate a previous configuration and recover data as initialization is a destructive process.

8. Create New VD Full Screen with All Details

When you’ve entered all the above values, the whole Create New Virtual Disk Screen will look as shown below.

Create new VD Full Screen For Dell PowerEdge T605 Tower Server
Fig: Create New VD Full Screen for DELL PowerEdge R200 Server

9. New Virtual Disk – Initialization Progress

Once the VD is created, you’ll see a new ‘Disk Group 1′ under ‘Controller 0′. There will be a progress bar next to the ‘Virtual Disk 1′ showing the progress of the initialization.

Virtual Disk Status For Dell PowerEdge M710 Blade Server
Fig: Virtual Disk Initialization Progress for DELL PowerEdge R300 Server

10. View Disk Group and Virtual Disk Properties

Expanding Disk Group 1 will display the following sub-items.
  • Virtual Disks
    • Virtual Disk 1
  • Physical Disks
    • slot# : status : size
    • 02: Online: 139392MB
    • 03: Online: 139392MB
    • 04: Online: 139392MB
    • 05: Online: 139392MB
  • Space Allocation
    • Virtual Disk 1

Use arrow key and highlight the Virtual Disk 1, which will display the following properties of both Virtual Disk and Disk Group on the right side.

Virtual Disk 1 Properties:
  • RAID Level: 5
  • RAID Status: Optimal (This will display degraded if any one of the disk in RAID5 failed)
  • Size: 408G
  • Operation: None. (During initialization process, this will display the status accordingly)

Disk Group 1 Properties:
  • VD Count: 1 (This is number of virtual disks in the disk group 1)
  • PD Count: 4 (This is the total number of physical disks that are part of this disk group)
  • Space Available: 0.000MB (The total number of free space available to create a new Virtual Disk in this disk group)
  • Free Segment: 0
  • Dedicated HS: 0

Virtual Disk Status for PowerEdge M610 Blade Server
Fig: Virtual Disk and Disk Group Properties for DELL PowerEdge R710 Server

The new disk configuration is now complete and available at the OS Level. Make sure to format and partition this new Virtual Disk at the OS level before mounting it.